National Repository of Grey Literature 17 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Alternative measurement of shape and position deviations for needs of incomming inspection.
Jaša, Aleš ; Pernikář, Jiří (referee) ; Zemčík, Oskar (advisor)
This thesis deals with a possibility how to make a check of purchased components faster at the incoming inspection of the Bosch Diesel s.r.o. (Co., Ltd) and perhaps even how to save investment in new machines during expanding of production without quality compromises during the check itself, so that everything would proceed according to ISO/TS 16949 standard, valid for an automotive industry. The whole practical part has been elaborated on the basis of measurements done at the incoming inspection measuring laboratories and in cooperation with QMM1.2 department. The results have been evaluated by statistical software qs-STAT ME 6 by Q-DAS company.
Input control performance analysis
Klečková, Eva ; Musil, Martin (referee) ; Fiala, Alois (advisor)
The purpose of this diploma dissertation is obtaining integrated summary of quality of supplied components, which has significant influence on structure of input control. To find required information were used the company’s complaints database and it’s selected data were processed by efficient tools of statistical analysis. To make the input control more efficient were found alternative solution on the base of recognized facto.
The proposal of the system of regular monitoring of the suppliers’ process capability indices
Kubica, Ondřej ; Zbudil, Ondřej (referee) ; Škapa, Stanislav (advisor)
This diploma thesis named “The Proposal of the System of Regular Monitoring of the Suppliers’ Process Capability Indices” is divided into two sections. There is a theory about statistical process control with emphasized process capability analysis in the first section. The content of the second section is starting point, procedure and the outcome of the project I worked on in Robert Bosch Company, České Budějovice. The aim of the project is the improvement of input quality via the evaluation of suppliers based on their outcomes of SPC.
Purchased Components Release for Serial Production without Incoming Inspection
Bil, Miroslav ; Osička, Karel (referee) ; Sedlák, Josef (advisor)
The theoretical part of this diploma thesis describes methods of incoming inspection with an emphasis on statistical sampling by attributes. The practical part contains an analysis of the qualifying process of suppliers and an analysis of the system of incoming inspection in the Kollmorgen Company. The outcome of the thesis is the system of sampling plans, review of the qualification process and setting up a parameter for monitoring the released parts into serial production.
Analysis system of input control.
Fouček, Petr ; Doňarová, Jana (referee) ; Koška, Petr (advisor)
This diplom thesis analyzes the current state of input control. To find required information were used the company’s complaints database and it’s selected data were processed by efficient tools of statistical analysis. To make the input control more efficient were found solution on the base of recognized facto.
Dynamization of input control by sampling procedures for inspection by attributes
Majerek, Pavel ; Pernikář, Jiří (referee) ; Koška, Petr (advisor)
This master´s thesis deals with the description of control selection methods with emphasis on sampling procedures for inspection by attributes in the theoretical part. In the practicel part, the input control system in the plant Siemens motors Frenstat is analyzed. The outcome of the thesis is the direction of the input control created in accordance with the requirements of the management of the organization and based on ISO 2859 standards.
The use of extended reality in the initial inspection of welded steel structures for the production of hydraulic aggregates
Losová, Jana ; Marada, Tomáš (referee) ; Zuth, Daniel (advisor)
This bachelor's thesis discusses the involvement of augmented reality in the process of incoming inspection of welded steel structures used for the production of hydraulic aggregates at the Bosch Rexroth company. The goal was to create and apply a proposal for a new procedure, according to which the material received from suppliers will be inspected. The Twyn program from Visometry company was chosen for the implementation of the proposal based on the head of the quality management department. The practical part showed that approximately 50% of the time can be saved by using this program in the dimensional incoming inspection process. The final part of the thesis discusses the other parameters involved in the savings and suggests further possibilities of using the purchased program.
Design of the process of input control of deliveries in the company
Ondřejová, Kateřina ; Sámelová, Vendula (referee) ; Maradová, Karla (advisor)
The thesis analyzes the current state of the process of incoming inspection in the company. It describes the current state of the process in the company and subsequent processes that are part of the whole organization. The thesis uses the PDCA methodology to define the weak points in the measurement system, which are parts of entry control. Furthermore, it will explain how tools and their applications are used to improve the measurement system the follow-up of the incoming inspection. Ultimately I would like to avoid an increase in low quality parts in the incoming inspection process. By implementing the defined methodologies, the data can be considered eligible and can be subsequently presented throughout the whole process.
Procesy kontroly kvality výroby zemědělské techniky na zpracování půdy
MELKA, František
This research work mainly deals with the methodology of quality control in the production process, which is focused on the production of tillage machines. The scope of work are quality control methods and their practical use in production. The work is focused on smaller production plants from the South Bohemian region, which deal with piece production according to the customer's wishes and test their products.
The importance of quality management in the initial stages of production
BENEŠOVÁ, Klára
This thesis focuses on the management of quality. The main goal was to analyze the quality management system in the initial stages of production of a particular company and to give a recommendation how to improve this system considering results and information that were found. The theoretical part was prepared from professional literature and electronic sources. The basic concepts of quality management were explained here.The practical part focuses on the company in the South Bohemian region. This thesis presents the characteristics of the company and an analysis of the current state of the quality system during the incoming inspection of materials and components. Emphasis is placed on the handling of goods that must not be damaged before being allowed into production. The implementation of all these recommendations should lead to increase quality and to streamlining the whole process of the company.

National Repository of Grey Literature : 17 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.